Miramonte Resort & Spa
Nizar Farhat, Jeff Allen PM
Location:
Indian Wells
CA
Size:
90,000+
Sq. Ft.
Completion:
2023
April
Cost:
$12
Million
0
Sq. Ft.
Cost:
$0
General contractor of site, lobby, restaurant, and room renovation projects. Complete infrastructure and remediation and finish of carpet, flooring, wallpaper, casework, electrical, mechanical, plumbing, and paint.
Palm Springs Surf Club
Client:
Colin O’Byrne
Location:
Palm Springs
CA
Size:
21
Acres
Completion:
2023
December
Cost:
$15.5
Million
0
Sq. Ft.
Cost:
$0
Statewide Services Inc., played a crucial role in developing a world-class destination, contributing significantly to the construction and enhancement of various features. Our meticulous construction of all the restaurants ensures that each dining experience meets the highest standards of quality and ambiance. Additionally, we revitalized the lazy river, constructed pools, and transformed common areas into inviting spaces for relaxation and recreation. A standout achievement is the construction of a 7500sf VIP two-story private lounge, exclusively accessible to members, boasting premium amenities like a plate-up kitchen and fully integrated meeting spaces. Our dedication to excellence has elevated the destination into a premier leisure and entertainment hub, offering guests an unparalleled experience of resort-style amenities, captivating waterpark attractions, and meticulously crafted dining options.
Fantasy Springs Resort Casino
Client:
Jim Schneider
Owner Rep
Location:
Indio
CA
Size:
133 ct. Rooms
Including 10 Suites
Completion:
2022
November
Cost:
$1.1
Million
0
Sq. Ft.
Cost:
$0
General Contractor, superintendent, Five (5) floors of room remodel including flooring, structural, mechanical, electric, plumbing, and upgrade of interior design models.
USC Keck School of Medicine
Client:
USC
Location:
Palm Desert
CA
Size:
2,400
Sq. Ft.
Completion:
2016
Cost:
$320,000
0
Sq. Ft.
Cost:
$0
Complete laboratory tenant improvement at the University of Southern California. Project included, but not limited to demolition of existing walls and offices, removing furniture, constructing new walls, drywall, mechanical and electrical, reconfiguration of fire sprinkler system, new casework, countertops, doors and hardware, installation of new tile and furniture, and patch and paint.
Agua Caliente Fuel Station
Client:
Agua Caliente Band of Cahuilla Indians
Location:
Rancho Mirage
CA
Size:
90,000+
Sq. Ft.
Completion:
2023
October
Cost:
$12.8
Million
0
Sq. Ft.
Cost:
$0
At Statewide Services Inc., we take pride in our ability to realize innovative projects, and our latest venture exemplifies this commitment. From inception to completion, we’ve constructed a dynamic destination that caters comprehensively to our customers’ needs. With features like a convenience market, Beer Cave, and drive-through Java Caliente, we’ve curated an unparalleled convenience experience. Additionally, we’ve successfully delivered a 750 square foot gaming area, accommodating 31 Class II gaming machines, providing customers with instant excitement. Moreover, the fuel station is equipped with 24 pumps dispensing various fuel types, ensuring customers can refuel both their vehicles and themselves conveniently. This project not only demonstrates our construction prowess but also establishes new benchmarks for convenience, entertainment, and overall customer satisfaction.
Skyline at Bliss & Oasis
Client:
Colin O’Byrne
Location:
Indio
CA
Size:
64
Units
Completion:
2026
Cost:
$25
Million
0
Sq. Ft.
Cost:
$0
Developer and general contractor for mixed-use apartment complex located in the heart of the revitalized downtown district. The largest privately-financed construction in the city.
Agua Caliente Cultural Plaza
Client:
Agua Caliente Band of Cahuilla Indians
Location:
Rancho Mirage
CA
Size:
90,000+
Sq. Ft.
Completion:
2023
October
Cost:
$34
Million
0
Sq. Ft.
Cost:
$0
Statewide Services completed a comprehensive construction and finishing project for the Agua Caliente Cultural Plaza. This included the full development of the museum which features planters, walkways, water features, and decorative walls. The project also involved all decorative wall finishes, including paint and wallpaper, enhancing the aesthetic and functional aspects of the center.
Okura
Client:
Jay Lee
Private Owner
Location:
La Quinta
CA
Size:
6,700
Sq. Ft.
Completion:
2019
December
Cost:
$1.2
Million
0
Sq. Ft.
Cost:
$0
General Contractor and management of 6700 SF design build of upscale sushi restaurant and bar. Complete renovation of plumbing, electrical, kitchen, cook line, refrigeration, flooring, and structural. Purchase and installation of finished stainless steel kitchen equipment. All points of entrance and bathrooms are ADA compliant. Additional scope of work was back patio oasis, fountain at front entrance, signage, VIP room, and custom décor, including RGB cycle lighting for signature Sokura cherry blossom tree.
Canyon Springs Villas
Client:
Colin O’Byrne
Location:
Cathedral City
CA
Size:
48
Units
Completion:
2026
Cost:
$38
Million
0
Sq. Ft.
Cost:
$0
Construction for an apartment complex located in up and coming area of Cathedral City, CA.
Agua Caliente Spa at Séc-He
Client:
Agua Caliente Band of Cahuilla Indians
Location:
Rancho Mirage
CA
Size:
90,000+
Sq. Ft.
Completion:
2023
October
Cost:
$34
Million
0
Sq. Ft.
Cost:
$0
Statewide Services completed a comprehensive construction and finishing project for the Agua Caliente Spa at Séc-He. This included the full development of spa finishes such as saunas, salt caves, and a zen garden. Site work for the spa was conducted, featuring planters, walkways, water features, and decorative walls. The project also involved all decorative wall finishes, including paint and wallpaper, enhancing the aesthetic and functional aspects of the spa.
Fantasy Springs Resort Casino / Rock Yard
Client:
Jim Schneider
Owner Rep
Location:
Indio
CA
Size:
5,000
Sq. Ft.
Completion:
2022
September
Cost:
$250,000
0
Sq. Ft.
Cost:
$0
General Contractor and management of 5000 SF design renovation of Fantasy Springs Resort Casino public venue “Rock Yard” stage. Project included structural steel installs, stadium lighting, custom hardscape paving, tiles, and landscaping.
Radisson / USC Hotel
Client:
USC
Deepal Jayasooriya, PM
Location:
Los Angeles
CA
Size:
12
Floors
Completion:
2021
May
Cost:
$3.2
Million
0
Sq. Ft.
Cost:
$0
Complete cosmetic conversion of Radisson Hotel to USC Hotel. The scope of work includes complete renovation of corridors and guest rooms. Removal and replacement of light fixtures and decorative fixtures along with carpet, base, and wallcoverings. All guest room aesthetic included: liquidation of FF&E, carpet/flooring R&R, restroom complete remodel, new tub, new tile, paint, installation of owner provided FF&E, and finish trim.
Desert Hematology
and Oncology
Client:
Green Towne Inc.
Location:
Rancho Mirage
CA
Size:
13,914
Sq. Ft.
Completion:
2020
May
Cost:
$1.25
Million
0
Sq. Ft.
Cost:
$0
Construction of a new one-story medical office building and tenant improvement for Desert Hematology and Oncology. Project included full site build-out and infrastructure utilities. In addition, new mechanical, electrical, plumbing work, framing, structural steel, stucco and drywall was completed. Paint and new landscaping is being done to close the job.
The Vue Grille & Bar
Client:
City of Indian Wells
Location:
Indian Wells
CA
Size:
6,700
Sq. Ft.
Completion:
2019
September
Cost:
$1.2
Million
0
Sq. Ft.
Cost:
$0
General Contractor and Superintendent of 5,650 sq. ft. design build of the kitchen, cook line, refrigeration, flooring, structural, mechanical, electric, and plumbing. Installation of finished stainless steel kitchen, hot line, and refrigeration. Additional scope of work included roofing, ceiling remodel, banquet bar design and rebuild, solid surface, lighting, and custom steel finish. Complete dining room remodel, custom framework, digital electronics control integration system, and new structural glazing ingress and egress point.
Sage Initiative Dental
Client:
Dr. J
Location:
Indio
CA
Size:
3,650
Sq. Ft.
Completion:
2018
Cost:
$420,000
0
Sq. Ft.
Cost:
$0
Existing one-story commercial building at Shadow Hills Plaza Commercial Complex in Indio, CA. Tenant improvement was for a new dental office that consisted of a main lobby at entrance and reception area, (2) women’s and (2) men’s restrooms, (1) janitor room, (1) conference room, (1) break room/conference room, (3) general offices, (9) dental exam rooms.
Temalpakh Farm
Client:
Augustine Band of Cahuilla Indians
Location:
Coachella
CA
Size:
40
Acres
Completion:
2023
December
Cost:
$15.5
Million
Cost:
$0
The comprehensive construction project at Temalpahk Farm encompassed a wide range of development activities. The scope of work included thorough site preparation and the installation of essential utilities, such as complete water, drainage, sewer, and electrical systems. It also involved both horizontal and vertical construction to establish all necessary site facilities and infrastructure. Key features of the project included finished landscaping enhanced with integrated lighting, as well as the implementation of a solar energy system to promote sustainability. The outcome of the project was a fully developed site that showcases functional, efficient, and environmentally conscious solutions.
Iron's Club
Client:
Coral Mountain Golf Club
Location:
La Quinta
CA
Size:
15,000
Acres
Completion:
2021
December
Cost:
$15.5
Million
Cost:
$0
Statewide Services, Inc. successfully completed the full construction of a modern restaurant inside the clubhouse at Trilogy at La Quinta. The project featured a sleek, contemporary design, seamlessly integrating high-end finishes and functional spaces to enhance the dining experience. With a focus on quality craftsmanship and attention to detail, Statewide Services delivered a stylish and inviting restaurant that complements the clubhouse’s upscale atmosphere.
Casino Morongo Food Court
Client:
Morongo Band of Mission Indians
Location:
Cabazon
CA
Size:
25,ooo
Sq. Ft.
Completion:
2020
December
Cost:
$15.5
Million
Cost:
$0
The project involved a comprehensive upgrade of the Casino Morongo Food Court, aimed at revitalizing the space to enhance the overall dining experience. The scope of work includes the installation of new flooring, the application of finished wallpaper and fresh paint, the refinement of key architectural elements, and the implementation of upgraded lighting to create a modern and inviting atmosphere. The outcome is a refreshed and aesthetically enhanced environment that significantly elevates the appeal and comfort of the food court for guests.
Spotlight 29 Casino Showroom
Client:
Twenty-Nine Palms Band of Mission Indians
Location:
Coachella
CA
Size:
2,200
Seat Showroom
Completion:
2022
December
Cost:
$15.5
Million
Cost:
$0
The project consisted of a full renovation of the Spotlight 29 Casino Showroom, a 2,200-seat venue. The scope of work included upgraded lighting and stage systems, wall refinishing, and fresh paint, along with comprehensive interior renovations throughout the space. The result was a revitalized showroom designed to deliver an enhanced experience for both performers and audiences.
Renova Energy Corporate Center
Client:
Renova Energy
Location:
Palm Desert
CA
Size:
30,000
Sq. Ft.
Completion:
2024
December
Cost:
$15.5
Million
Cost:
$0
The project involved the renovation of a 30,000 square foot office space, designed to highlight cutting-edge innovation and modern aesthetics. The scope of work includes a complete office remodel featuring a sophisticated and contemporary design, with a strong emphasis on advanced architectural elements and the use of top-quality materials. The renovation is guided by the latest trends in office design, aiming to create a workspace that is not only visually striking but also highly functional. The outcome is a state-of-the-art environment that offers a contemporary, efficient, and stylish setting for work.
L.A. Memorial Coliseum Press box
Client:
USC
Location:
Los Angeles
CA
Size:
18,000
Sq. Ft.
Completion:
2019
December
Cost:
$15.5
Million
Cost:
$0
As a key contributor to the Coliseum renovation and restoration, the project focused on constructing a new press box atop a newly built structure on the stadium’s south side. The scope of work included the construction of a modern press box equipped with premium amenities, the addition of suites, loge boxes, and upgraded seating, all aimed at enhancing the overall visitor experience. The outcome was a significant elevation of the stadium’s facilities, offering upgraded amenities and delivering a more refined and enjoyable experience for spectators.
Pívat Cigar Lounge
Client:
Agua Caliente Band of Chauilla Indians
Location:
Rancho Mirage
CA
Size:
4,500
Sq. Ft.
Completion:
2022
December
Cost:
$15.5
Million
Cost:
$0
The project involved the full construction and expansion of the Pívat Cigar Lounge, resulting in a 4,500-square-foot state-of-the-art facility. The scope of work included the installation of a custom-designed and engineered HVAC and extraction system to ensure optimal air quality. Additionally, the lounge features custom laser-cut paneling and humidor casegoods, enhancing its refined aesthetic. A Smart Tech Louvre “Smart Patio Plus” system was integrated, along with necessary site work and drainage improvements. The expansion also incorporated a full Class 1 and 2 gaming area with capabilities for two table games. The completed project delivers a luxurious environment that seamlessly combines sophisticated design, cutting-edge technology, and premium gaming amenities.
Tower Market
Client:
Tower Energy Group
Location:
Coachella Valley
CA
Size:
5,500
Sq. Ft.
Completion:
2024
December
Cost:
$15.5
Million
Cost:
$0
Statewide Services Inc. proudly partnered in the development of a premier Tower Market location, delivering a seamless fusion of function, design, and customer convenience. From the ground up, our team executed every phase of construction with precision—ensuring the highest standards in fuel infrastructure, site layout, and customer experience. The result is a next-generation gas station that goes far beyond the pump. We constructed a state-of-the-art 5,500 sf convenience store featuring expansive glass storefronts, high-efficiency lighting, and integrated HVAC systems designed for optimal energy performance. Inside, we built modern food and beverage service areas, including a full coffee bar and grab-and-go kitchen, offering a welcoming environment for commuters and travelers alike.
Outside, we managed the installation of advanced fuel canopy systems, EV charging stations, and safe, ADA-compliant access points. Landscaped zones and custom hardscaping elements further enhance the site’s appearance and durability. From initial grading to final finishes, every detail was delivered with Statewide’s commitment to quality, safety, and long-term performance—positioning Tower Market as a destination of choice for fuel, food, and convenience.
Gentiva Health Services
Client:
Jay Lee
Private Owner
Location:
Palm Desert
CA
Size:
5,200
Sq. Ft.
Completion:
2014
Cost:
$550,000
0
Sq. Ft.
Cost:
$0
Existing one-story grey shell building tenant improvement in The Village at University Park. Project included, but not limited to underground water, metal stud framing, drywall, t-bar, insulation, installation of HVAC units, electrical outlets, low voltage re-wiring, installation of new flooring, glazing, doors and hardware, plumbing, and painting.
Miramonte / Tommy Bahama Hotel
Client:
Miramonte Resort & Spa
Nizar Farhat, Jeff Allen PM
Location:
Indian Wells
CA
Size:
90,000+
Sq. Ft.
Completion:
2023
April
Cost:
$12
Million
0
Sq. Ft.
Cost:
$0
General contractor of site, lobby, restaurant, and room renovation projects. Complete infrastructure and remediation and finish of carpet, flooring, wallpaper, casework, electrical, mechanical, plumbing, and paint.